TCDD Signalization – Scada Systems

TCDD SIGNALIZATION – SCADA SYSTEMS

Lefyapı had successfully completed the following works within the scope of Irmak – Karabük – Zonguldak Railway Line Rehabilitation and Signalization Project, 60 km route between Karabük and İsmetpaşa stations

  • Cabling
  • Line-long signaling
  • Energy
  • Fiber optic cables and telephone systems cables pulling and testing
  • Shelter Foundation construction (22 units)
  • Shelter Earthing and Paratoner
  • Under-Rail Transitions
  • Earth Channel Construction (60 KM)
  • Concrete Channel Construction (5.KM)
  • Signalization and Control Systems Equipments.