TCDD SIGNALIZATION – SCADA SYSTEMS
Lefyapı had successfully completed the following works within the scope of Irmak – Karabük – Zonguldak Railway Line Rehabilitation and Signalization Project, 60 km route between Karabük and İsmetpaşa stations
- Cabling
- Line-long signaling
- Energy
- Fiber optic cables and telephone systems cables pulling and testing
- Shelter Foundation construction (22 units)
- Shelter Earthing and Paratoner
- Under-Rail Transitions
- Earth Channel Construction (60 KM)
- Concrete Channel Construction (5.KM)
- Signalization and Control Systems Equipments.